![]() |
| Tac has built the 4 cool room panel shower cubicles and next will be the 4 toilets. |
![]() |
| The grouting is almost done. |
| Almost completely finished the men's side. All cubicles built with doors made and locks fitted and tiling and grouting complete. |
![]() |
| Stunning! |



No comments:
Post a Comment